Catalogue export
REQUEST A QUOTE AND LEAD TIME
STANDARDS / DTU / QUOTE
HOOKS
02.IM.04 YOU: Company:
TEMPORARY GUARDRAILS FOR DRY PROFILE
AND CLAMPS DOWNPIPES
Contact:
Date:
Address:
Telephone:
Fax:
Email:
ACCESSORIES FOR PPE
WORKSITE: Name:
Contact:
Address:
HOOKS
Telephone: Project type: New build - Renovation
Project phase: Study - Project
YOUR ROOF:
CLOUT NAILS AND NAILS
L
Number of identical roofs to be protected: ______
R
SNOWSTOPS
Slope in °: ____________ (the slope must be strictly lower than 30°) Length of the roof (l) in metres: ____________ Number of slope bases: 1 - 2 Roof slope length (r) in metres: ____________ Number of edges: 1- 2-3- 4 Interval distance between waves: 250 - 333 - Others: ______ specify the profile reference: ____________ MATERIAL TYPE: Protection with pole height 1.18 m with high bar D.30 + plinth + net (Standard P93-355) Protection with pole height 1.18 m, + 2 bars D.30 + plinth (Standard EN 13-374-A/B) Protection with pole height 1.18m, + 1 bar D.30 + Net EN 1261 + plinth (Standard EN 13-374-A/B) For information purposes, the interval distance on 250 profile between guardrails is 1.25 m and the interval distance on 333 profile between guardrails is 1.33 m.
ROOF
LADDERS CLADDING
ROOF
ANCHORS
PERSONAL PRO TECTION
Project No.: FRENEHARD price offer:
Lead time:
working days + transport
COLLECTIVE
PROTECTION
Request to be sent by fax to +33 (0)2 33 34 89 90 to the Sales Administration Department. Controlled by: ABO – DVD / Version dated 08-11-17
133
DTU - QUOTE
STANDARDS /
Made with FlippingBook - Online magazine maker