Catalogue export

REQUEST A QUOTE AND LEAD TIME

STANDARDS / DTU / QUOTE

HOOKS

02.IM.04 YOU: Company:

TEMPORARY GUARDRAILS FOR DRY PROFILE

AND CLAMPS DOWNPIPES

Contact:

Date:

Address:

Telephone:

Fax:

Email:

ACCESSORIES FOR PPE

WORKSITE: Name:

Contact:

Address:

HOOKS

Telephone: Project type:  New build -  Renovation

Project phase:  Study -  Project

YOUR ROOF:

CLOUT NAILS AND NAILS

L

Number of identical roofs to be protected: ______

R

SNOWSTOPS

Slope in °: ____________ (the slope must be strictly lower than 30°) Length of the roof (l) in metres: ____________ Number of slope bases: 1 - 2 Roof slope length (r) in metres: ____________ Number of edges: 1- 2-3- 4 Interval distance between waves:  250 -  333 -  Others: ______ specify the profile reference: ____________ MATERIAL TYPE:  Protection with pole height 1.18 m with high bar D.30 + plinth + net (Standard P93-355)  Protection with pole height 1.18 m, + 2 bars D.30 + plinth (Standard EN 13-374-A/B)  Protection with pole height 1.18m, + 1 bar D.30 + Net EN 1261 + plinth (Standard EN 13-374-A/B) For information purposes, the interval distance on 250 profile between guardrails is 1.25 m and the interval distance on 333 profile between guardrails is 1.33 m.

ROOF

LADDERS CLADDING

ROOF

ANCHORS

PERSONAL PRO TECTION

Project No.: FRENEHARD price offer:

Lead time:

working days + transport

COLLECTIVE

PROTECTION

Request to be sent by fax to +33 (0)2 33 34 89 90 to the Sales Administration Department. Controlled by: ABO – DVD / Version dated 08-11-17

133

DTU - QUOTE

STANDARDS /

Made with FlippingBook - Online magazine maker