Catalogue export

REQUEST A QUOTE AND LEAD TIME

STANDARDS / DTU / QUOTE

HOOKS

02.IM.02

TEMPORARY PROTECTION ON CLEAT ZINC

AND CLAMPS DOWNPIPES

YOU: Company: Address:

Contact:

Date:

Telephone:

Fax:

Email:

ACCESSORIES FOR PPE

WORKSITE: Name:

Contact:

Address:

HOOKS

Telephone: Project type:  New build -  Renovation

Project phase:  Study -  Project

CLOUT NAILS AND NAILS

YOUR ROOF:

L

R

SNOWSTOPS

Number of identical roofs to be protected: ______

ROOF

LADDERS CLADDING

Slope in °: ______ (the slope must be strictly lower than 30°) Length of the roof (l) in metres: ______ Number of slope bases:  1 -  2 Roof slope length (r) in metres: ______ Number of edges:  1 -  2 Number of roof-ridges:  1 -  2 –  Others: ______ Zinc sheet span width (mm):  500 -  650 –  Others: ______ For information purposes, the interval distance between guardrails is 1.50 m at most. Guardrails are 1.18 m in height and bars 1.65 m. connection points are provided with butyl strips for waterproofing, with no installation screws.

ROOF

ANCHORS

PERSONAL PRO TECTION

Project No.: FRENEHARD price offer:

Lead time:

working days + transport Request to be sent by fax to +33 (0)2 33 34 89 90 to the Sales Administration Department. Controlled by: ABO – DVD / Version dated 08-11-17

COLLECTIVE

PROTECTION

131

DTU - QUOTE

STANDARDS /

Made with FlippingBook - Online magazine maker